Securing Remote Train Control for UGL Regional Link
The Challenge UGL Regional Linx needed to enable remote control of train operations from a new control centre located at Orange NSW. Introducing remote control into a safety-critical rail environment meant cyber security risk had to be managed to Transport for NSW’s stringent requirements — and proven compliant before go-live. The Solution L2iQ was engaged […]
Canberra Light Rail — Stage 2A
The Challenge Canberra Light Rail Stage 2A required end-to-end delivery of all rail technology systems within a Design and Construct contract, while managing the critical interface with the existing operational Stage 1 network running alongside the construction zone. This demands specialist expertise in live-network interface management, systems integration, operational safety, and multi-stakeholder coordination across ACT […]
Canberra Light Rail — Stage
The Challenge The delivery of Canberra’s inaugural light rail line required end-to-end systems integration and technology architecture capability. The Gungahlin to Alinga corridor needed to achieve demanding journey time targets while integrating with Canberra’s existing road traffic management systems — requiring sophisticated signal priority design and SCATS integration across a complex urban corridor that had […]