Customer Counting & Tracking

The Challenge Questacon’s distinctive building design presented a complex environment for CCTV deployment. Obstructions throughout the facility, together with constrained cable pathways and mounting locations, meant that conventional camera placement could not always provide the required coverage. The dynamic nature and configuration of the exhibits also needed to be considered when determining the most suitable […]

V/Line MTO — New Train Control Desk

The Challenge V/Line needed to alleviate the workload of Bendigo Train Controllers and accommodate additional services on the Bendigo corridor by adding a new Train Control Workstation at Centrol IOC. The existing Bendigo WestCAD system was obsolete, making a conventional new workstation installation impractical and requiring an innovative alternative technical solution. The Solution L2iQ designed […]

V/Line — Virtualisation of Obsolete Train Control Systems

The Challenge V/Line operated multiple Train Control platforms — Bendigo WestCAD, Aspectus and Melbourne Metro Phoenix — on obsolete, unsupported hardware running end-of-life operating systems (Windows XP, Windows 7, Windows Server 2016). This created significant and growing risks of hardware failure, security vulnerabilities and loss of vendor support, with no viable path to continued safe […]

V/Line — OCS Network Infrastructure Uplift

The Challenge V/Line’s Operational Control System (OCS) network required significant infrastructure uplift across multiple domains to support the Regional Rail Revival program, improve cyber readiness, and address performance and visibility gaps across the core routing, distribution switching and WAN layers. The work spanned multiple concurrent projects across a live operational network. The Solution L2iQ initially […]

Sydney Metro — Western Sydney Airport Rail

The Challenge The Western Sydney Airport Metro Rail project required specialist technical expertise in Communications systems to develop a credible installation strategy, programme, and resource analysis for one of Australia’s most significant rail infrastructure investments. The scale, complexity and airport operational interface requirements made this a technically demanding engagement from day one. The Solution L2iQ […]

Sydney Metro — Nozomi OT Security Monitoring

The Challenge Sydney Metro required improved visibility and monitoring of their operational technology environments and key rail sub-systems. Existing tools provided limited insight into OT network traffic, leaving significant gaps in real-time threat detection and asset visibility across critical rail infrastructure — making it difficult to identify and respond to OT security incidents in a […]

Securing the Glenrowan Solar Farm SCADA Environment

The Challenge The Glenrowan Solar Farm — a 130 MW solar project located near Wangaratta in regional Victoria — operates a SCADA environment that is critical to the safe generation and dispatch of electricity to the grid. As a participant in Australia’s energy sector, the asset owner faced a regulatory obligation to demonstrate compliance with […]

Parramatta Light Rail — Stage 2 Technical Advisory

The Challenge The Parramatta Light Rail Stage 2 project required specialist rail systems design leadership to develop the reference design and business case. A multi-stakeholder program of this complexity demands deep technical expertise across requirements development, interface management, procurement strategy and interoperability — combined with the practical operational insight that only comes from having delivered […]

Parramatta Light Rail — Stage 1

The Challenge The Parramatta Light Rail Stage 1 project, between Westmead and Carlingford via the Parramatta CBD and Camellia, required physical installation of all rail systems across the new network prior to dynamic testing and passenger service commencement. This included achieving demanding intersection performance targets, requiring complex configuration and coordination with road traffic management systems […]

Metro Trains Melbourne — TCMS Hardware Refresh

The Challenge Metro Trains Melbourne needed to upgrade all hardware and software supporting its live Siemens Train Control Management System (TCMS) environment. The refresh had to be executed with minimal operational impact, maintaining strict safety and availability requirements throughout, while managing the risks inherent in upgrading a live, safety-critical OT system. The Solution L2iQ was […]