The Challenge
A regional train operator needed to alleviate the workload of Train Controllers and accommodate additional services on the corridor by adding a new Train Control Workstation at its Integrated Operations Centre. The existing system was obsolete, making a conventional new workstation installation impractical and requiring an innovative alternative technical solution.
The Solution
L2iQ designed and implemented a secure IP KVM (Keyboard, Video, Mouse) solution that enabled the new workstation to remotely access the existing system. This avoided the need to replace obsolete infrastructure while still delivering the required remote train control capability. L2iQ managed the full scope from design through to testing and commissioning.
What L2iQ Delivered
- Secure & reliable IP KVM system design and configuration enabling remote access from the new workstation
- Technical design for new Train Control Workstation at the Integrated Operations Centre
- Integration with the existing obsolete infrastructure
- Train Control Workstation Installation
- System testing and commissioning within agreed project timeline
- Documentation and handover to operational teams
The Outcome
The solution was successfully designed, implemented, tested, and commissioned by L2iQ to the agreed timeline and budget (no variations). The project demonstrated L2iQ’s expertise in train control system desk setup, associated technologies, and the logistical complexities of delivering within a live operational rail environment. Additional corridor services are now supported from the new workstation.