ARTC — Electrical & Earthing Design

The Challenge ARTC was developing a new greenfield Wayside Monitoring Location at Korunye (53.50 km) on the East–West rail line between Two Wells and Mallala, South Australia. The site required new wayside monitoring equipment, an equipment building and a dedicated mains power supply. The installation included a Hot Bearing Detector / Hot Wheel Detector (HBD/HWD) […]

Customer Counting & Tracking

The Challenge Questacon’s distinctive building design presented a complex environment for CCTV deployment. Obstructions throughout the facility, together with constrained cable pathways and mounting locations, meant that conventional camera placement could not always provide the required coverage. The dynamic nature and configuration of the exhibits also needed to be considered when determining the most suitable […]

V/Line MTO — New Train Control Desk

The Challenge V/Line needed to alleviate the workload of Bendigo Train Controllers and accommodate additional services on the Bendigo corridor by adding a new Train Control Workstation at Centrol IOC. The existing Bendigo WestCAD system was obsolete, making a conventional new workstation installation impractical and requiring an innovative alternative technical solution. The Solution L2iQ designed […]

V/Line — Virtualisation of Obsolete Train Control Systems

The Challenge V/Line operated multiple Train Control platforms — Bendigo WestCAD, Aspectus and Melbourne Metro Phoenix — on obsolete, unsupported hardware running end-of-life operating systems (Windows XP, Windows 7, Windows Server 2016). This created significant and growing risks of hardware failure, security vulnerabilities and loss of vendor support, with no viable path to continued safe […]

V/Line — OCS Network Infrastructure Uplift

The Challenge V/Line’s Operational Control System (OCS) network required significant infrastructure uplift across multiple domains to support the Regional Rail Revival program, improve cyber readiness, and address performance and visibility gaps across the core routing, distribution switching and WAN layers. The work spanned multiple concurrent projects across a live operational network. The Solution L2iQ initially […]

Sydney Metro — Western Sydney Airport Rail

The Challenge The Western Sydney Airport Metro Rail project required specialist technical expertise in Communications systems to develop a credible installation strategy, programme, and resource analysis for one of Australia’s most significant rail infrastructure investments. The scale, complexity and airport operational interface requirements made this a technically demanding engagement from day one. The Solution L2iQ […]

Sydney Metro — Nozomi OT Security Monitoring

The Challenge Sydney Metro required improved visibility and monitoring of their operational technology environments and key rail sub-systems. Existing tools provided limited insight into OT network traffic, leaving significant gaps in real-time threat detection and asset visibility across critical rail infrastructure — making it difficult to identify and respond to OT security incidents in a […]

Sydney Light Rail — OT Virtualisation

The Challenge Transdev’s Sydney Light Rail operations relied on physical Operational Technology assets that introduced increasing hardware dependency, lifecycle risk, and maintenance complexity as the assets aged. Virtualising the OT environment was identified as the pathway to reducing operational risk, improving resilience, reducing OPEX and enabling a more sustainable long-term OT management model without disrupting […]

Sydney Light Rail — City & South East (CSELR)

The Challenge The Sydney CBD and Southeast Light Rail required final integration, testing & commissioning and performance tuning of the complex multi-system infrastructure which made up the light rail — including traffic priority/SCATS, CCS, SCADA, CCTV, PA, PID and network systems — for a successful transition into first passenger service. Delivered within a PPP model, […]

Securing the Glenrowan Solar Farm SCADA Environment

The Challenge The Glenrowan Solar Farm — a 130 MW solar project located near Wangaratta in regional Victoria — operates a SCADA environment that is critical to the safe generation and dispatch of electricity to the grid. As a participant in Australia’s energy sector, the asset owner faced a regulatory obligation to demonstrate compliance with […]